SUCCESS STORIES

Projects and Engineering

CLIENT
Bellvitge Hospital
PUBLICATION DATE
09/19/2022
CATEGORY
Hospital Environments

Case study of the engineering, installation, and maintenance of the surgical block made up of 24 operating rooms at the University Hospital of Bellvitge

SUCCESS STORIES

Digitization of 24 Operating Rooms in Bellvitge

The University Hospital of Bellvitge is a health center that registers about 20,000 major surgical interventions annually and has about 4,300 professionals.

The Hospital had a large surgical block, built in 2008, pending its commissioning and with a design that was not originally designed for any type of Audiovisual Integration. Consequently, the first challenge presented to the Ditec Medical Engineering team was to carry out a complete remodeling of the Digitalization process, consisting of a total of 24 operating rooms, in a space where there were no facilities for installation (cable runs, hanging elements, non-existent access, etc.). The second great challenge for the team was to carry out the complete digitalization in only 9 months.

In the attached case study, you will discover how the Ditec Medical team technically solved all these peculiarities to give the doctors and workers of the center new tools that will completely change the way of working in and out of an operating room.

In addition, we provide the video with the comments of the medical managers from the first experiences after the integration of the new surgical block of the Hospital.

Related Projects